Warranty: | 5 Years |
---|---|
Type: | Trailer Parts |
Certification: | ISO/TS16949 |
Samples: |
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Product | post-tensioned anchorages u bar c purlin and z purlin/Prime hot rolled mild steel u bar |
size | 160*63*8.5mm |
Length | 6m/12m |
Standard | AISI,ASTM,JIS,DIN,BS,ENetc. |
Material | 304,304L,316,316l,Q235,Q345,Q195 |
Shape | U channel |
Technique | Hot rolled & Welded |
Application | 1.Industrial structure of the steel structure bearing bracket. 2.Underground engineering steel pile and retaining structure. 3.Petrochemical and electric power and other industrial equipment structure 4.Large span steel bridge components 5.Ships, machinery manufacturing frame structure 6.The train, automobile, tractor beam bracket 7.Port of conveyor belt, high speed damper bracket |
Package | Standard seaworthy packing or as required |
Port of Shipment | Tianjin Port, China |
Date of Delivery | 10-15 days after received the deposit |
MOQ | 10T |
Production | 5000t/ month |
Payment | T/T, L/C, Western union etc. |
Standard | AISI, ASTM, BS, DIN, GB, JIS etc. |
Material | SS400, Q 235B,S235JR,Q345B, S355JR etc. |
Technique | Hot rolled & Welded |
Application | 1.Industrial structure of the steel structure bearing bracket. 2.Underground engineering steel pile and retaining structure. 3.Petrochemical and electric power and other industrial equipment structure 4.Large span steel bridge components 5.Ships, machinery manufacturing frame structure 6.The train, automobile, tractor beam bracket 7.Port of conveyor belt, high speed damper bracket |
Package | Standard seaworthy packing or as required |
Port of Shipment | Tianjin Port, China |
Date of Delivery | 10-15 days after received the deposit |
MOQ | 10T |
Production | 5000t/ month |
Payment | T/T, L/C, Western union etc. |
Suppliers with verified business licenses