Customization: | Available |
---|---|
Color: | Transparent, Color |
Certification: | ISO9001, FDA, LFGB, REACH, RoHS |
Still deciding? Get samples of US$ 1/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Capacity
|
50ml
|
100ml
|
200ml
|
250ml
|
350ml
|
500ml
|
Height
|
106mm
|
128mm
|
150mm
|
160mm
|
170mm
|
198mm
|
Weight
|
79g
|
125g
|
200g
|
248g
|
254g
|
350g
|
Neck Size
|
28mm
|
30mm
|
30mm
|
30mm
|
35mm
|
35mm
|
Bottom Length
|
52mm
|
64mm
|
77mm
|
83mm
|
90mm
|
102mm
|
Surface Hanlding
|
Hot stamping, Silk screen printing , Spray painting ,Frosting , Decal , Electroplating,Label, ect.
|
|||||
Caps
|
Aluminum Caps, Plastic Caps, Anti-thief Caps, Pump, etc.
|
|||||
Color
|
Transparency, Customer's Requirements.
|
|||||
Usage
|
Cold Coffee, Beverage, Liquor, Milk, Tea, Perfume, etc.
|
|||||
MOQ
|
A:If we have stock, smaller MOQ.
|
B:If out of stock, MOQ is 5000~30000pcs
|
||||
Package
|
Carton, Pallet, Customer's Requirements.
|
|||||
Delivery
|
(1) In stock : within 7 days after receiving payment.
(2) Out of stock : 25 ~ 40 days after receiving payment.
|
|||||
Logo
|
Customer's Requirements.
|
OEM/ODM
|
Acceptable
|
Time flow:
1. In stock: 7-15 Days
2. Made to order: 25-35 Days
3. Made to order, requiring new molds and deep processing: 50-75 Days
Feature:
1) Crown cap could be offered 2) Customized mold will be welcome 3) Logo can be made on bottle body
Sealing type |
swing top |
package |
Pallet; Pallet + Cartom;color Carton |
Delivery time |
Pallet packaging 20 days ;carton packaging within 30 days |
Trade terms |
FOB CIF DDP DDU |
Deep processing |
Color painting,Decoration firing,Screen printing,Electoplating,Embossing |
customer |
Accept customer customization |
Minimum order quantity |
pcs |
Pallet+Carton packaging |
pcs*cases;Total pcs |
1. Raw Materials: Silica sand, Soda ash, Limestone and others
2.Batch house: Weighing and mixing of raw material, and transport to the hopper at the melting furnace
3.Melting: Melting of mixed raw materials about 1550ºC in the melting furnace
4.Feeding: Feeding of glass gob at optimum temperature suitable to bottle weight and shape is fed into a glass bottle-forming
machine via the feeder.
5.Forming: Forming of bottle by the glass bottle-forming machine for designed bottle shape
6.Annealing: Annealing of bottles as they leave the glass bottle-forming machine
7.Inspection: After annealing in the lehr , a bottle is strictly checked on Automatic inspection machine and visually inspect each
bottle to confirm quality by skilled technicians
8.Additional processing: Decal, Frosting, spraying
9.Packing and Shipment: Bottles are packed according to their destination, and are stored in the warehouse or shipped